Case Study: Insurance Reinstatement at Baines School – Recovering from Heavy Rainfall

At TJ Joinery & Construction (NW) Ltd, we’re ready to step in when unexpected events disrupt daily life. Our recent insurance work at Baines School in Poulton-le-Fylde is a prime example of how we efficiently restored a vital community space after heavy rainfall caused widespread flooding.

The Situation

Baines School, a well-regarded secondary school, suffered significant damage when prolonged heavy rainfall overwhelmed its drainage systems. Water poured into the building, affecting classrooms, corridors, and key areas like the library and IT suites. Floors were saturated, walls took a soaking, and essential facilities were left unusable. With the school term in full swing, a swift response was critical to keep education on track.

Our Approach

We moved quickly to manage this large-scale reinstatement project under the insurance claim. Here’s how we handled it:

  • Rapid Assessment: Our team arrived on-site to evaluate the damage, coordinating with the school and insurers to identify all affected areas—covering multiple classrooms, hallways, and support spaces.
  • Water Extraction: Using pumps, wet vacuums, and dehumidifiers, we removed standing water and dried out the building, tackling dampness to avoid mould or structural problems.
  • Reinstatement Works: We replaced ruined flooring—carpets in staff areas and vinyl in busy zones—repaired water-damaged plasterboard walls, and fixed ceilings where needed. The library’s shelving and IT suites’ equipment were reinstated to working order.
  • Systems Check: We inspected and repaired electrics for safety, restored heating, and ensured plumbing was fully functional after the deluge.
  • Final Touches: Fresh paint and reinstated fittings completed the job, returning the school to its pre-flood condition.

The Result

In just a few weeks, we had Baines School back in shape. Every flooded area was fully restored, allowing students and staff to resume normal activities with minimal interruption. Our fast and thorough work ensured the school met safety standards and maintained its role as a cornerstone of the community.

Why It Matters

This project highlights our ability to deliver large-scale insurance reinstatement efficiently. Whether it’s a school, office, or home hit by heavy rainfall, we’ve got the skills to get you sorted quickly.

Need help with flood recovery, fire damage or any peril? Reach out to us today to discuss your insurance project.

£500,000
Project Value
12 weeks
Project Duration
July 2023
Completion Date
Insurance
Project Category